{"id":42834,"date":"2026-09-30T08:00:00","date_gmt":"2026-09-30T06:00:00","guid":{"rendered":"https:\/\/ironcad.eu\/?p=42834"},"modified":"2026-09-30T08:00:00","modified_gmt":"2026-09-30T06:00:00","slug":"buyumekte-olan-bir-ic-mimarlik-firmasi-ne-zaman-daha-iyi-bir-cizim-yazilimina-veya-ek-kapasiteye-yatirim-yapmalidir","status":"publish","type":"post","link":"https:\/\/ironcad.eu\/tr\/buyumekte-olan-bir-ic-mimarlik-firmasi-ne-zaman-daha-iyi-bir-cizim-yazilimina-veya-ek-kapasiteye-yatirim-yapmalidir\/","title":{"rendered":"B\u00fcy\u00fcmekte olan bir i\u00e7 mimarl\u0131k firmas\u0131, ne zaman daha iyi bir \u00e7izim yaz\u0131l\u0131m\u0131na veya ek kapasiteye yat\u0131r\u0131m yapmal\u0131d\u0131r?"},"content":{"rendered":"<p>B\u00fcy\u00fcyen bir i\u00e7 mimarl\u0131k \u015firketi, mevcut \u00e7\u00f6z\u00fcm\u00fcn size ay\u0131ramayaca\u011f\u0131n\u0131z kadar zaman kaybettirdi\u011fi anda daha iyi bir \u00e7izim yaz\u0131l\u0131m\u0131na yat\u0131r\u0131m yapmal\u0131d\u0131r: i\u015flemler \u00e7ok yava\u015f, manuel i\u015f y\u00fck\u00fc \u00e7ok fazla ya da sipari\u015fleri zaman\u0131nda tamamlamak i\u00e7in kapasite yetersiz. \u00c7o\u011fu \u015firket i\u00e7in bu an, sand\u0131klar\u0131ndan daha erken gelir. A\u015fa\u011f\u0131daki sorular, \u015fu anda hangi noktada oldu\u011funuzu ve ilerlemek i\u00e7in en ak\u0131ll\u0131ca ad\u0131m\u0131n ne oldu\u011funu belirlemenize yard\u0131mc\u0131 olacakt\u0131r.  <\/p>\n<h2>Mevcut \u00e7izim yaz\u0131l\u0131m\u0131n\u0131z\u0131n b\u00fcy\u00fcmenizi engelledi\u011fini g\u00f6steren i\u015faretler nelerdir?<\/h2>\n<p>Mevcut \u00e7izim yaz\u0131l\u0131m\u0131n\u0131z, bir \u00e7izim yapmak \u00fcr\u00fcn\u00fcn kendisini \u00fcretmekten daha uzun s\u00fcr\u00fcyorsa, m\u00fc\u015fterilerin taleplerindeki de\u011fi\u015fiklikler saatlerce ek \u00e7izim \u00e7al\u0131\u015fmas\u0131na yol a\u00e7\u0131yorsa ya da \u00e7izimcinin i\u015f y\u00fck\u00fcn\u00fc kald\u0131ramamas\u0131 nedeniyle sipari\u015fleri reddetmek zorunda kal\u0131yorsan\u0131z, b\u00fcy\u00fcmenizi engelliyor demektir. Bunlar, yaz\u0131l\u0131m\u0131n \u015firketinizin hedeflerine ayak uyduramad\u0131\u011f\u0131n\u0131n somut i\u015faretleridir. <\/p>\n<p>Di\u011fer yayg\u0131n belirtiler \u015funlard\u0131r:<\/p>\n<ul>\n<li>Sistemler aras\u0131nda verileri manuel olarak aktard\u0131\u011f\u0131n\u0131z i\u00e7in \u00f6l\u00e7\u00fc de\u011ferlerinde s\u0131k s\u0131k hata yap\u0131yorsunuz<\/li>\n<li>M\u00fc\u015fteriler daha h\u0131zl\u0131 teklifler istiyor, ancak ayr\u0131nt\u0131l\u0131 bir \u00e7izim haz\u0131rlamak i\u00e7in birka\u00e7 g\u00fcne ihtiyac\u0131n\u0131z var<\/li>\n<li>Yeni \u00e7al\u0131\u015fanlar\u0131n mevcut yaz\u0131l\u0131mda verimli hale gelmeleri aylar s\u00fcr\u00fcyor<\/li>\n<li>H\u00e2l\u00e2 2D \u00e7izimlerle \u00e7al\u0131\u015f\u0131yorsunuz, oysa m\u00fc\u015fteriler ve m\u00fcteahhitler giderek daha s\u0131k 3D g\u00f6rselle\u015ftirmeler talep ediyor<\/li>\n<li>Tasar\u0131m\u0131n son a\u015famalar\u0131nda yap\u0131lan de\u011fi\u015fiklikler her seferinde \u00e7ok zaman al\u0131r<\/li>\n<\/ul>\n<p>Bu i\u015faretlerin her biri tek ba\u015f\u0131na bir de\u011ferlendirme nedeni olu\u015fturur. Bunlardan birka\u00e7\u0131n\u0131 fark ediyorsan\u0131z, durum acildir. <\/p>\n<h2>Yaz\u0131l\u0131m g\u00fcncellemesini \u00e7ok uzun s\u00fcre ertelemek neye mal olur?<\/h2>\n<p>Yaz\u0131l\u0131m g\u00fcncellemesini \u00e7ok uzun s\u00fcre ertelemek, \u015firketinize \u00fc\u00e7 \u015fekilde maddi kayba yol a\u00e7ar: verimsiz i\u015f ak\u0131\u015flar\u0131 nedeniyle kaybedilen \u00e7al\u0131\u015fma saatleri, yeterince h\u0131zl\u0131 teklif veremedi\u011finiz i\u00e7in ka\u00e7\u0131r\u0131lan i\u015fler ve zaten daha h\u0131zl\u0131 ve daha do\u011fru \u00e7al\u0131\u015fan rakiplere kar\u015f\u0131 giderek artan geride kalma durumu. Bu maliyetler, faturada hemen g\u00f6r\u00fcnmese bile birikmeye devam eder. <\/p>\n<p>Her g\u00fcn manuel i\u015flemler i\u00e7in fazladan bir saat harcayan bir \u00e7izim uzman\u0131, bir y\u0131lda 200&#8217;den fazla verimli saat kaybeder. Bunlar, yeni projelere ayr\u0131lmayan saatlerdir. Ayn\u0131 zamanda, i\u00e7 mimari sekt\u00f6r\u00fcndeki m\u00fc\u015fteriler giderek daha k\u0131sa teslim s\u00fcreleri beklemektedir. Bu tempoya ayak uyduramayan \u015firketler, tasar\u0131m s\u00fcre\u00e7lerini zaten otomatikle\u015ftirmi\u015f rakiplerine i\u015flerini kapt\u0131rmaktad\u0131r.   <\/p>\n<p>Bunun yan\u0131 s\u0131ra, hata riski de bulunmaktad\u0131r. \u00d6l\u00e7\u00fc verilerinin kesim listelerine veya sat\u0131n alma listelerine manuel olarak aktar\u0131lmas\u0131, maliyetli \u00fcretim hatalar\u0131 olas\u0131l\u0131\u011f\u0131n\u0131 art\u0131r\u0131r. Tek bir d\u00fczeltme sipari\u015fi bile, daha iyi bir yaz\u0131l\u0131ma yap\u0131lan yat\u0131r\u0131m\u0131 hakl\u0131 k\u0131labilir.  <\/p>\n<h2>Ne zaman yeni bir yaz\u0131l\u0131m sat\u0131n almaktansa ek bir \u00e7izim uzman\u0131 i\u015fe almak daha iyidir?<\/h2>\n<p>Darbo\u011faz\u0131n tamamen insan g\u00fcc\u00fcyle ilgili bir sorun oldu\u011fu ve mevcut yaz\u0131l\u0131m\u0131n teknik a\u00e7\u0131dan yeterli oldu\u011fu durumlarda, yeni yaz\u0131l\u0131m sat\u0131n almaktansa ek kapasite kiralamak daha iyidir. Bu durum, \u00e7izimcilerin verimli \u00e7al\u0131\u015ft\u0131\u011f\u0131, yaz\u0131l\u0131m\u0131n modern i\u015flevler sundu\u011fu, ancak i\u015f hacminin mevcut ekip i\u00e7in \u00e7ok fazla oldu\u011fu durumlarda ge\u00e7erlidir. Di\u011fer \u00e7o\u011fu durumda ise ek bir \u00e7izim uzman\u0131, as\u0131l sorunu \u00e7\u00f6zmez.  <\/p>\n<p>Aradaki fark, kapasite bask\u0131s\u0131n\u0131n kayna\u011f\u0131nda yat\u0131yor. \u015eunu bir d\u00fc\u015f\u00fcn\u00fcn: \u0130kinci bir \u00e7izimci i\u015fe al\u0131rsan\u0131z ve ayn\u0131 verimsiz yaz\u0131l\u0131m\u0131 kullan\u0131rsan\u0131z, \u00e7\u0131kt\u0131y\u0131 da ikiye katlar m\u0131s\u0131n\u0131z? Yoksa sadece verimsizli\u011fi mi ikiye katlars\u0131n\u0131z? \u00c7izim s\u00fcreci kendisi yava\u015fsa, iki yava\u015f \u00e7izimciyle de yine bir sorunla kar\u015f\u0131 kar\u015f\u0131ya kal\u0131rs\u0131n\u0131z.   <\/p>\n<p>Uzun vadeli maliyetleri de g\u00f6z \u00f6n\u00fcnde bulundurun. Ek bir kadrolu \u00e7al\u0131\u015fan, yap\u0131sal maa\u015f maliyetleri getirir. Daha iyi bir yaz\u0131l\u0131m ise, birden fazla \u00e7al\u0131\u015fan\u0131n i\u015fini ayn\u0131 anda h\u0131zland\u0131ran tek seferlik bir yat\u0131r\u0131md\u0131r. B\u00fcy\u00fcmekte olan \u00e7o\u011fu i\u00e7 mimarl\u0131k \u015firketi i\u00e7in, her ikisini bir arada uygulamak ger\u00e7ek\u00e7i bir yakla\u015f\u0131md\u0131r: \u00f6nce yaz\u0131l\u0131m\u0131 optimize etmek, ard\u0131ndan gerekirse kapasiteyi art\u0131rmak.   <\/p>\n<h2>\u015eirketinizin CAD yaz\u0131l\u0131m\u0131 de\u011fi\u015fikli\u011fine haz\u0131r olup olmad\u0131\u011f\u0131n\u0131 nas\u0131l anlars\u0131n\u0131z?<\/h2>\n<p>\u015eirketiniz, mevcut durumun getirdi\u011fi s\u0131k\u0131nt\u0131lar\u0131n ge\u00e7i\u015f e\u015fi\u011fini a\u015ft\u0131\u011f\u0131 zaman bir CAD yaz\u0131l\u0131m\u0131 de\u011fi\u015fikli\u011fine haz\u0131r demektir. Somut olarak bu \u015fu anlama gelir: Yukar\u0131da bahsedilen i\u015faretlerin bir\u00e7o\u011funu fark ediyorsunuz, ekibinizde destek buluyorsunuz ve e\u011fitim ve ge\u00e7i\u015f s\u00fcrecine k\u0131sa bir s\u00fcre i\u00e7in yat\u0131r\u0131m yapmaya haz\u0131rs\u0131n\u0131z. Bu, ger\u00e7ek\u00e7i ve ula\u015f\u0131labilir bir ba\u015flang\u0131\u00e7 noktas\u0131d\u0131r.  <\/p>\n<p>Bir ge\u00e7i\u015f, her \u015feyin bir anda de\u011fi\u015fece\u011fi anlam\u0131na gelmez. Bir\u00e7ok \u015firket, tek bir \u00e7izimci veya tek bir proje t\u00fcr\u00fcyle ba\u015flay\u0131p daha sonra ad\u0131m ad\u0131m geni\u015fler. \u00d6nceden hangi \u00e7\u0131kt\u0131y\u0131 otomatikle\u015ftirmek istedi\u011finizi netle\u015ftirmek faydal\u0131d\u0131r: kesim listeleri, sat\u0131n alma listeleri, NC kodlar\u0131 veya m\u00fc\u015fteriler i\u00e7in 3D g\u00f6rselle\u015ftirmeler. \u0130stekleriniz ne kadar somut olursa, yeni bir yaz\u0131l\u0131m paketinin bu ihtiya\u00e7lar\u0131 kar\u015f\u0131lay\u0131p kar\u015f\u0131lamad\u0131\u011f\u0131n\u0131 o kadar kolay de\u011ferlendirebilirsiniz.   <\/p>\n<p>Ayr\u0131ca, yaz\u0131l\u0131m tedarik\u00e7isinin <a href=\"https:\/\/ironcad.eu\/trainingen\/\">sundu\u011fu e\u011fitim<\/a> se\u00e7eneklerine de g\u00f6z at\u0131n. Birka\u00e7 g\u00fcn i\u00e7inde \u00f6\u011frenilebilen yaz\u0131l\u0131mlar, t\u00fcm ekip i\u00e7in \u00f6\u011frenme e\u015fi\u011fini \u00f6nemli \u00f6l\u00e7\u00fcde d\u00fc\u015f\u00fcr\u00fcr ve yat\u0131r\u0131m\u0131n geri d\u00f6n\u00fc\u015f s\u00fcresini k\u0131salt\u0131r. <\/p>\n<h2>CAD yaz\u0131l\u0131m paketlerini de\u011ferlendirirken neleri kar\u015f\u0131la\u015ft\u0131rmal\u0131s\u0131n\u0131z?<\/h2>\n<p>CAD yaz\u0131l\u0131m paketlerini de\u011ferlendirirken, yaln\u0131zca i\u015flevleri de\u011fil, ayn\u0131 zamanda \u00f6\u011frenme e\u011frisini, \u00fcretim i\u015f ak\u0131\u015f\u0131n\u0131zla entegrasyon olanaklar\u0131n\u0131 ve birka\u00e7 y\u0131la yay\u0131lan toplam maliyetleri de kar\u015f\u0131la\u015ft\u0131r\u0131rs\u0131n\u0131z. Ka\u011f\u0131t \u00fczerinde pek \u00e7ok \u015fey yapabilen ancak haftalarca e\u011fitim gerektiren bir paket, k\u00fc\u00e7\u00fck bir i\u00e7 mimarl\u0131k firmas\u0131 i\u00e7in h\u0131zl\u0131 bir \u015fekilde verimlilik sa\u011flayan esnek bir \u00e7\u00f6z\u00fcmden daha az uygundur. <\/p>\n<p>Paketleri a\u015fa\u011f\u0131daki hususlara g\u00f6re kar\u015f\u0131la\u015ft\u0131r\u0131n:<\/p>\n<ul>\n<li><strong>Tasar\u0131m \u00f6zg\u00fcrl\u00fc\u011f\u00fc:<\/strong> Tasar\u0131m\u0131n ilerleyen a\u015famalar\u0131nda, her \u015feyi ba\u015ftan olu\u015fturmaya gerek kalmadan de\u011fi\u015fiklikler yapabilir misiniz?<\/li>\n<li><strong>Otomatik \u00e7\u0131kt\u0131:<\/strong> Yaz\u0131l\u0131m, 3B modelden otomatik olarak kesim listeleri, malzeme listeleri ve NC kodlar\u0131 olu\u015fturuyor mu?<\/li>\n<li><strong>\u00d6\u011frenme e\u011frisi:<\/strong> Yeni bir kullan\u0131c\u0131n\u0131n kendi ba\u015f\u0131na verimli bir \u015fekilde \u00e7al\u0131\u015fmaya ba\u015flamas\u0131 ne kadar s\u00fcrer?<\/li>\n<li><strong>Entegrasyon:<\/strong> Yaz\u0131l\u0131m, ERP sisteminize veya di\u011fer kurumsal yaz\u0131l\u0131mlar\u0131n\u0131za entegre edilebiliyor mu?<\/li>\n<li><strong>Destek:<\/strong> Kendi dilinizde yerel <a href=\"https:\/\/ironcad.eu\/tr\/destek\/\">teknik destek<\/a> mevcut mu?<\/li>\n<li><strong>\u00d6l\u00e7eklenebilirlik:<\/strong> Ekibiniz b\u00fcy\u00fcd\u00fck\u00e7e veya \u00fcr\u00fcn yelpazenizi geni\u015flettik\u00e7e yaz\u0131l\u0131m da buna ayak uydurabilir mi?<\/li>\n<\/ul>\n<p>Her zaman kendi projenizle bir demo talep edin. Soyut g\u00f6sterimler, yeni yaz\u0131l\u0131mda kendi mobilya par\u00e7an\u0131z\u0131 veya i\u00e7 mekan tasar\u0131m\u0131n\u0131z\u0131 ad\u0131m ad\u0131m inceledi\u011finiz bir oturum kadar a\u00e7\u0131klay\u0131c\u0131 de\u011fildir. <\/p>\n<h2>\u0130\u015fletmenizin b\u00fcy\u00fcme s\u00fcrecinde yat\u0131r\u0131m yapmak en k\u00e2rl\u0131 oldu\u011fu an hangisidir?<\/h2>\n<p>Daha iyi \u00e7izim yaz\u0131l\u0131m\u0131na yat\u0131r\u0131m yapmak, b\u00fcy\u00fcmeye yeni ba\u015flad\u0131\u011f\u0131n\u0131z anda en k\u00e2rl\u0131d\u0131r; zaten s\u0131n\u0131rlara ula\u015ft\u0131\u011f\u0131n\u0131zda de\u011fil. Erken yat\u0131r\u0131m yapmak, b\u00fcy\u00fcme a\u015famas\u0131na verimli bir altyap\u0131yla girmenizi sa\u011flar; b\u00f6ylece her yeni i\u015f, kapasite sorunlar\u0131n\u0131 \u00e7\u00f6zmek yerine do\u011frudan k\u00e2r marj\u0131na katk\u0131 sa\u011flar. <\/p>\n<p>Uygulamada bir\u00e7ok \u015firket \u00e7ok uzun s\u00fcre beklemektedir. Art\u0131k ger\u00e7ekten ba\u015fka \u00e7are kalmad\u0131\u011f\u0131nda yat\u0131r\u0131m yaparlar; oysa yeni yaz\u0131l\u0131m, artan i\u015f hacmine hemen uygulanabildi\u011finde getiri en y\u00fcksek seviyeye ula\u015f\u0131r. Ayda on projeden yirmi projeye \u00e7\u0131kan bir \u015firket, y\u0131llard\u0131r ayn\u0131 i\u015f hacminde kalan bir \u015firkete k\u0131yasla otomatikle\u015ftirilmi\u015f \u00e7\u0131kt\u0131lardan \u00e7ok daha fazla fayda sa\u011flar.  <\/p>\n<p>\u0130yi bir kural: \u00c7izim i\u015flerini y\u00f6netmeye, yeni i\u015fler almaya ay\u0131rd\u0131\u011f\u0131n\u0131z zamandan daha fazla zaman harcad\u0131\u011f\u0131n\u0131z\u0131 fark ederseniz, o an \u00e7oktan gelmi\u015ftir. \u0130\u015fleri reddetmek zorunda kalaca\u011f\u0131n\u0131z noktay\u0131 beklemeyin. O zaman \u00e7ok ge\u00e7 kalm\u0131\u015f olursunuz ve gecikmenin maliyeti \u00e7oktan ortaya \u00e7\u0131km\u0131\u015f olur.  <\/p>\n<h2>IronCAD, i\u00e7 mimari sekt\u00f6r\u00fcnde b\u00fcy\u00fcmeye nas\u0131l katk\u0131da bulunuyor?<\/h2>\n<p>IronCAD, b\u00fcy\u00fcmekte olan i\u00e7 mimarl\u0131k firmalar\u0131n\u0131 en \u00e7ok etkileyen durumlarda \u00f6zellikle g\u00fc\u00e7l\u00fc bir 3B CAD \u00e7\u00f6z\u00fcm\u00fcd\u00fcr: h\u0131zl\u0131 tasar\u0131m, esnek uyarlama ve do\u011fru \u00fcretim \u00e7\u0131kt\u0131s\u0131n\u0131 otomatik olarak olu\u015fturma. Geleneksel CAD paketleri, her de\u011fi\u015fiklikte karma\u015f\u0131k bir ge\u00e7mi\u015f a\u011fac\u0131n\u0131 yeniden olu\u015fturman\u0131z\u0131 gerektirirken, IronCAD bu t\u00fcr k\u0131s\u0131tlamalar olmadan \u00e7al\u0131\u015f\u0131r. Bu da, m\u00fc\u015fterinin son ana kadar de\u011fi\u015fiklik yapabildi\u011fi \u00f6zel sipari\u015fler i\u00e7in \u00f6zellikle uygun olmas\u0131n\u0131 sa\u011flar.  <\/p>\n<p>Somut olarak, IronCAD i\u00e7 mimarl\u0131k firmalar\u0131na \u015funlar\u0131 sunar:<\/p>\n<ul>\n<li>Yeni kullan\u0131c\u0131lar\u0131n birka\u00e7 g\u00fcn i\u00e7inde kolayca \u00f6\u011frenebilece\u011fi <strong>sezgisel 3D tasar\u0131m<\/strong> <\/li>\n<li>3D modelden do\u011frudan <strong>otomatik olarak olu\u015fturulan kesim listeleri, malzeme listeleri ve NC kodlar\u0131<\/strong> <\/li>\n<li>Karma\u015f\u0131k tasar\u0131m ge\u00e7mi\u015flerine ba\u011fl\u0131 kalmaks\u0131z\u0131n, tasar\u0131m\u0131n her a\u015famas\u0131nda <strong>esnek de\u011fi\u015fiklikler<\/strong> <\/li>\n<li>Tamamen otomatikle\u015ftirilmi\u015f bir \u00fcretim s\u00fcreci i\u00e7in ERP yaz\u0131l\u0131m\u0131yla <strong>sorunsuz entegrasyon<\/strong> <\/li>\n<li>Hollandaca dilinde <strong>yerel destek<\/strong> ve e\u011fitim<\/li>\n<\/ul>\n<p>IronCAD&#8217;in b\u00fcy\u00fcme a\u015faman\u0131za ve \u00e7al\u0131\u015fma tarz\u0131n\u0131za uygun olup olmad\u0131\u011f\u0131n\u0131 \u00f6\u011frenmek ister misiniz? Kendi projeleriniz temelinde, herhangi bir taahh\u00fct gerektirmeyen bir g\u00f6r\u00fc\u015fme veya demo i\u00e7in <a href=\"https:\/\/ironcad.eu\/tr\/iletisim\/\">bizimle ileti\u015fime ge\u00e7in<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Tasar\u0131m yaz\u0131l\u0131m\u0131n\u0131z\u0131n b\u00fcy\u00fcmenizi engelledi\u011fine dair i\u015faretleri fark edin \u2014 ve yat\u0131r\u0131m yapman\u0131n en karl\u0131 oldu\u011fu zaman\u0131 ke\u015ffedin.<\/p>\n","protected":false},"author":11,"featured_media":42836,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[267],"tags":[],"dipi_cpt_category":[],"class_list":["post-42834","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ironcad"],"_links":{"self":[{"href":"https:\/\/ironcad.eu\/tr\/wp-json\/wp\/v2\/posts\/42834","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ironcad.eu\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ironcad.eu\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ironcad.eu\/tr\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/ironcad.eu\/tr\/wp-json\/wp\/v2\/comments?post=42834"}],"version-history":[{"count":1,"href":"https:\/\/ironcad.eu\/tr\/wp-json\/wp\/v2\/posts\/42834\/revisions"}],"predecessor-version":[{"id":45212,"href":"https:\/\/ironcad.eu\/tr\/wp-json\/wp\/v2\/posts\/42834\/revisions\/45212"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ironcad.eu\/tr\/wp-json\/wp\/v2\/media\/42836"}],"wp:attachment":[{"href":"https:\/\/ironcad.eu\/tr\/wp-json\/wp\/v2\/media?parent=42834"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ironcad.eu\/tr\/wp-json\/wp\/v2\/categories?post=42834"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ironcad.eu\/tr\/wp-json\/wp\/v2\/tags?post=42834"},{"taxonomy":"dipi_cpt_category","embeddable":true,"href":"https:\/\/ironcad.eu\/tr\/wp-json\/wp\/v2\/dipi_cpt_category?post=42834"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}