{"id":43119,"date":"2026-08-27T08:00:00","date_gmt":"2026-08-27T06:00:00","guid":{"rendered":"https:\/\/ironcad.eu\/?p=43119"},"modified":"2026-08-27T08:00:00","modified_gmt":"2026-08-27T06:00:00","slug":"uretim-surecimdeki-darbo-noktanin-is-hazirligim-olup-olmadigini-nasil-anlarim","status":"publish","type":"post","link":"https:\/\/ironcad.eu\/tr\/uretim-surecimdeki-darbo-noktanin-is-hazirligim-olup-olmadigini-nasil-anlarim\/","title":{"rendered":"\u00dcretim s\u00fcrecimdeki darbo noktan\u0131n i\u015f haz\u0131rl\u0131\u011f\u0131m olup olmad\u0131\u011f\u0131n\u0131 nas\u0131l anlar\u0131m?"},"content":{"rendered":"<p>Onaylanm\u0131\u015f bir sipari\u015f ile \u00fcretimin ba\u015flamas\u0131 aras\u0131ndaki s\u00fcre, \u00fcretimin kendisinin s\u00fcresinden daha uzunsa, \u00fcretim haz\u0131rl\u0131\u011f\u0131n\u0131z muhtemelen \u00fcretim s\u00fcrecinizdeki darbo\u011fazd\u0131r. Bu, imalat sekt\u00f6r\u00fcnde, \u00f6zellikle de \u00f6zel \u00fcretim yapan \u015firketlerde s\u0131k\u00e7a kar\u015f\u0131la\u015f\u0131lan bir sorundur. Bu makalede, yava\u015f i\u015f haz\u0131rl\u0131\u011f\u0131n\u0131n tespit edilmesi, \u00f6l\u00e7\u00fclmesi ve \u00e7\u00f6z\u00fclmesi ile ilgili en s\u0131k sorulan sorular\u0131 yan\u0131tl\u0131yoruz.  <\/p>\n<h2>Hangi i\u015faretler i\u015f haz\u0131rl\u0131\u011f\u0131n\u0131n yava\u015f ilerledi\u011fini g\u00f6sterir?<\/h2>\n<p>Yava\u015f i\u015f haz\u0131rl\u0131\u011f\u0131n\u0131n en belirgin i\u015faretleri \u015funlard\u0131r: \u00fcretim sahas\u0131na ula\u015fana kadar uzun s\u00fcre bekleyen sipari\u015fler, \u00e7izimlerle ilgili d\u00fczenli olarak a\u00e7\u0131klama isteyen \u00e7al\u0131\u015fanlar ve sonradan d\u00fczeltilmesi gereken \u00fcretim emirlerinde tekrarlanan hatalar. Bu kal\u0131plar\u0131 fark ediyorsan\u0131z, i\u015f haz\u0131rl\u0131\u011f\u0131 neredeyse kesin olarak bir darbo\u011fazd\u0131r. <\/p>\n<p>Di\u011fer pratik i\u015faretler \u015funlard\u0131r:<\/p>\n<ul>\n<li>\u00dcretim \u00e7al\u0131\u015fanlar\u0131, i\u015f emirlerinin zaman\u0131nda haz\u0131r olmamas\u0131 nedeniyle s\u0131k s\u0131k i\u015flerini durdurmak zorunda kal\u0131yor<\/li>\n<li>Tekliflerin haz\u0131rlanmas\u0131 uzun s\u00fcr\u00fcyor \u00e7\u00fcnk\u00fc teknik detaylar\u0131n belirlenmesi \u00e7ok zaman al\u0131yor<\/li>\n<li>Ayn\u0131 bilgiler, farkl\u0131 sistemlere manuel olarak birden fazla kez giriliyor<\/li>\n<li>\u00c7izimler ve par\u00e7a listeleri her zaman nihai sipari\u015fle uyu\u015fmaz<\/li>\n<li>Planlamac\u0131lar, i\u015f haz\u0131rl\u0131k s\u00fcrecinin \u00f6ng\u00f6r\u00fclemez bir \u015fekilde uzun s\u00fcrmesi nedeniyle teslim s\u00fcrelerini tahmin etmekte zorlan\u0131yor<\/li>\n<\/ul>\n<p>Tehlike, bu i\u015faretlerin yava\u015f yava\u015f ortaya \u00e7\u0131kmas\u0131d\u0131r. \u0130nsan buna al\u0131\u015f\u0131r. Ancak bu arada bask\u0131 artar, teslimat g\u00fcvenilirli\u011fi azal\u0131r ve hem \u00e7al\u0131\u015fanlar hem de m\u00fc\u015fteriler aras\u0131nda hayal k\u0131r\u0131kl\u0131\u011f\u0131 b\u00fcy\u00fcr.  <\/p>\n<h2>\u0130\u015f haz\u0131rl\u0131k s\u00fcresini nas\u0131l \u00f6l\u00e7ersiniz?<\/h2>\n<p>\u0130\u015f haz\u0131rl\u0131k s\u00fcresini, sipari\u015f onay\u0131 an\u0131ndan t\u00fcm \u00fcretim belgelerinin \u00fcretim sahas\u0131na haz\u0131r hale geldi\u011fi ana kadar ge\u00e7en s\u00fcreyi takip ederek \u00f6l\u00e7ersiniz. Ard\u0131ndan bu s\u00fcreyi fiili \u00fcretim s\u00fcresiyle kar\u015f\u0131la\u015ft\u0131rarak, hangi a\u015faman\u0131n en fazla zaman ald\u0131\u011f\u0131n\u0131 belirleyin. <\/p>\n<p>Ba\u015flamak i\u00e7in basit bir yol, her sipari\u015f i\u00e7in \u00fc\u00e7 zaman damgas\u0131 kaydetmektir:<\/p>\n<ol>\n<li>M\u00fc\u015fteri taraf\u0131ndan <strong>sipari\u015fin onayland\u0131\u011f\u0131 an<\/strong> <\/li>\n<li>\u00c7izimler, par\u00e7a listeleri ve \u00e7al\u0131\u015fma talimatlar\u0131 dahil olmak \u00fczere <strong>i\u015f haz\u0131rl\u0131\u011f\u0131 tamamland\u0131\u011f\u0131 an<\/strong><\/li>\n<li><strong>\u00dcr\u00fcn\u00fcn at\u00f6lyeden \u00e7\u0131kt\u0131\u011f\u0131 an<\/strong><\/li>\n<\/ol>\n<p>1. ve 2. zaman noktalar\u0131 aras\u0131ndaki fark, i\u015f haz\u0131rl\u0131\u011f\u0131 i\u00e7in gereken s\u00fcredir. Bu s\u00fcre, 2. ve 3. zaman noktalar\u0131 aras\u0131ndaki farktan daha b\u00fcy\u00fckse, i\u015f haz\u0131rl\u0131\u011f\u0131 senin darbo\u011faz\u0131nd\u0131r. Geli\u015fmi\u015f bir yaz\u0131l\u0131m olmasa bile, bunu basit bir tabloda takip edebilirsiniz. Sonu\u00e7, en fazla kazanc\u0131n nereden elde edilebilece\u011fine dair size an\u0131nda bir fikir verir.   <\/p>\n<h2>\u0130\u015f haz\u0131rl\u0131\u011f\u0131n\u0131n yava\u015flamas\u0131n\u0131n en yayg\u0131n nedenleri nelerdir?<\/h2>\n<p>\u0130\u015f haz\u0131rl\u0131\u011f\u0131n\u0131n yava\u015flamas\u0131n\u0131n en yayg\u0131n nedenleri aras\u0131nda manuel ve hataya a\u00e7\u0131k s\u00fcre\u00e7ler, standartla\u015ft\u0131r\u0131lm\u0131\u015f \u00e7al\u0131\u015fma y\u00f6ntemlerinin bulunmamas\u0131 ve birbirinden ba\u011f\u0131ms\u0131z, entegre olmayan yaz\u0131l\u0131m ara\u00e7lar\u0131n\u0131n kullan\u0131lmas\u0131 yer almaktad\u0131r. Bu fakt\u00f6rlerin her biri, hata olas\u0131l\u0131\u011f\u0131n\u0131 art\u0131r\u0131r ve \u00fcretim sahas\u0131na giden bilgi ak\u0131\u015f\u0131n\u0131 yava\u015flat\u0131r. <\/p>\n<p>Somut olarak, uygulamada en s\u0131k kar\u015f\u0131la\u015f\u0131lan nedenler \u015funlard\u0131r:<\/p>\n<ul>\n<li>\u00c7izim program\u0131, teklif sistemi ve \u00fcretim planlamas\u0131 aras\u0131nda <strong>verilerin manuel olarak aktar\u0131lmas\u0131<\/strong> <\/li>\n<li><strong>Mevcut tasar\u0131mlar\u0131n yeniden kullan\u0131lmamas\u0131<\/strong> nedeniyle her sipari\u015f s\u0131f\u0131rdan ba\u015fl\u0131yor<\/li>\n<li>Kullan\u0131m\u0131 olduk\u00e7a zaman alan <strong>karma\u015f\u0131k CAD yaz\u0131l\u0131m\u0131<\/strong>; \u00f6zellikle \u00f6zel tasar\u0131m varyantlar\u0131nda<\/li>\n<li>Kesim listeleri, sat\u0131n alma listeleri ve NC kodlar\u0131n\u0131n <strong>otomasyonunun eksikli\u011fi<\/strong> <\/li>\n<li>Sat\u0131\u015f, m\u00fchendislik ve \u00fcretim departmanlar\u0131 aras\u0131nda teknik \u00f6zelliklere ili\u015fkin <strong>ileti\u015fim sorunlar\u0131<\/strong> <\/li>\n<\/ul>\n<p>Dikkat \u00e7eken bir nokta, bir\u00e7ok \u015firketin sorunun insanlarda oldu\u011funu d\u00fc\u015f\u00fcnmesi, oysa as\u0131l sorunun sistemde yatmas\u0131d\u0131r. Ayr\u0131 ara\u00e7larla \u00e7al\u0131\u015fan ve otomatikle\u015ftirilmi\u015f \u00e7\u0131kt\u0131 elde edemeyen bir \u00e7al\u0131\u015fan, entegre yaz\u0131l\u0131mla \u00e7al\u0131\u015fan bir \u00e7al\u0131\u015fan kadar h\u0131zl\u0131 olamaz. <\/p>\n<h2>\u0130\u015f haz\u0131rl\u0131\u011f\u0131n\u0131 \u00fcretimdeki di\u011fer darbo\u011fazlarla nas\u0131l kar\u015f\u0131la\u015ft\u0131r\u0131rs\u0131n\u0131z?<\/h2>\n<p>Her bir i\u015flem ad\u0131m\u0131 i\u00e7in bekleme s\u00fcresini ve i\u015fleme s\u00fcresini belirleyerek, i\u015f haz\u0131rl\u0131\u011f\u0131n\u0131 di\u011fer darbo\u011fazlarla kar\u015f\u0131la\u015ft\u0131r\u0131rs\u0131n\u0131z. \u0130\u015fleme s\u00fcresine oranla bekleme s\u00fcresinin en y\u00fcksek oldu\u011fu ad\u0131m, genellikle as\u0131l darbo\u011fazd\u0131r. \u00d6zel \u00fcretim yapan firmalarda, i\u015f haz\u0131rl\u0131\u011f\u0131 bu a\u00e7\u0131dan genellikle fiili \u00fcretimden daha k\u00f6t\u00fc bir performans g\u00f6sterir.  <\/p>\n<p>Bunu g\u00f6rselle\u015ftirmenin pratik bir yolu, basit bir de\u011fer ak\u0131\u015f\u0131 analizidir. Sipari\u015fi talep a\u015famas\u0131ndan teslimata kadar ad\u0131m ad\u0131m inceleyip her ad\u0131mda \u015funlar\u0131 not edersiniz: <\/p>\n<ul>\n<li>Bu ad\u0131m\u0131n kendisi ne kadar s\u00fcrer?<\/li>\n<li>Sipari\u015f, ad\u0131m\u0131n ba\u015flamas\u0131 i\u00e7in ne kadar s\u00fcre bekler?<\/li>\n<li>Hatalar nedeniyle bu ad\u0131m ne s\u0131kl\u0131kla tekrarlanmal\u0131d\u0131r?<\/li>\n<\/ul>\n<p>Bu ba\u011flamda bir\u00e7ok \u00fcretim \u015firketi, \u00fcretim sahas\u0131n\u0131n kendisinin iyi performans g\u00f6sterdi\u011fini, ancak sipari\u015flerin i\u015f planlama a\u015famas\u0131nda uzun s\u00fcre bekleme kuyru\u011funda kald\u0131\u011f\u0131n\u0131 fark ediyor. Bu, \u00e7ok de\u011ferli bir i\u00e7g\u00f6r\u00fc; \u00e7\u00fcnk\u00fc i\u015f planlama a\u015famas\u0131 tedariki k\u0131s\u0131tlad\u0131\u011f\u0131 s\u00fcrece, \u00fcretim sahas\u0131na ek makine veya personel yat\u0131r\u0131m\u0131 yapman\u0131n pek bir etkisi olmayaca\u011f\u0131 anlam\u0131na geliyor. <\/p>\n<h2>\u0130\u015f haz\u0131rl\u0131\u011f\u0131n\u0131 h\u0131zland\u0131rmaya yard\u0131mc\u0131 olan ara\u00e7lar nelerdir?<\/h2>\n<p>\u0130\u015f haz\u0131rl\u0131\u011f\u0131n\u0131 h\u0131zland\u0131ran ara\u00e7lar aras\u0131nda, otomatik \u00e7\u0131kt\u0131 olu\u015fturma \u00f6zelli\u011fine sahip entegre CAD yaz\u0131l\u0131mlar\u0131, tasar\u0131m verileriyle do\u011frudan ba\u011flant\u0131l\u0131 ERP sistemleri ve \u00f6zel \u00fcretim varyantlar\u0131n\u0131n h\u0131zl\u0131 bir \u015fekilde geli\u015ftirilmesini sa\u011flayan konfig\u00fcrat\u00f6rler yer almaktad\u0131r. En b\u00fcy\u00fck kazan\u00e7, tasar\u0131m ve \u00fcretim aras\u0131ndaki manuel ad\u0131mlar\u0131n ortadan kald\u0131r\u0131lmas\u0131ndan kaynaklanmaktad\u0131r. <\/p>\n<p>Durumunuza ba\u011fl\u0131 olarak, a\u015fa\u011f\u0131daki ara\u00e7 t\u00fcrleri en etkili olanlard\u0131r:<\/p>\n<ul>\n<li>Karma\u015f\u0131k ge\u00e7mi\u015f yap\u0131lar\u0131 olmadan tasar\u0131mlar\u0131n h\u0131zla de\u011fi\u015ftirilmesini sa\u011flayan <strong>3D CAD yaz\u0131l\u0131m\u0131<\/strong> <\/li>\n<li>Tasar\u0131mdan <strong>kesim listeleri, malzeme listeleri ve NC kodlar\u0131n\u0131n otomatik olarak olu\u015fturulmas\u0131<\/strong> <\/li>\n<li><strong>ERP entegrasyonu<\/strong> sayesinde sipari\u015f verileri otomatik olarak i\u015f planlamas\u0131na aktar\u0131l\u0131r<\/li>\n<li>S\u0131f\u0131rdan ba\u015flamak zorunda kalmadan \u00f6zel tasar\u0131m s\u00fcrecini h\u0131zland\u0131ran <strong>yeniden kullan\u0131labilir tasar\u0131m bile\u015fenleri<\/strong> <\/li>\n<\/ul>\n<p>Kullan\u0131lacak ara\u00e7lar\u0131n se\u00e7imi, b\u00fcy\u00fck \u00f6l\u00e7\u00fcde sekt\u00f6r\u00fcn\u00fcze ba\u011fl\u0131d\u0131r. <a href=\"https:\/\/ironcad.eu\/tr\/subeler\/\">\u0130malat sekt\u00f6r\u00fc ve mobilya \u00fcretimi<\/a> alan\u0131ndaki \u015firketlerin ihtiya\u00e7lar\u0131, makine \u00fcreticilerinin ihtiya\u00e7lar\u0131ndan farkl\u0131d\u0131r, ancak temel ilke ayn\u0131d\u0131r: Manuel ad\u0131mlar ne kadar az olursa, i\u015f haz\u0131rl\u0131\u011f\u0131 o kadar h\u0131zl\u0131 ve g\u00fcvenilir olur. <\/p>\n<h2>\u0130\u015f planlaman\u0131z\u0131 ne zaman otomatikle\u015ftirmelisiniz?<\/h2>\n<p>\u0130\u015f haz\u0131rl\u0131k s\u00fcresinin \u00fcretim s\u00fcresinden yap\u0131sal olarak daha uzun oldu\u011fu, manuel \u00e7al\u0131\u015fmalardan kaynaklanan hatalar\u0131n d\u00fczenli olarak yeniden i\u015fleme yol a\u00e7t\u0131\u011f\u0131 veya i\u015f haz\u0131rl\u0131k s\u00fcrecinin kapasiteyi kar\u015f\u0131layamamas\u0131 nedeniyle b\u00fcy\u00fcme hedeflerinizin k\u0131s\u0131tland\u0131\u011f\u0131 durumlarda, i\u015f haz\u0131rl\u0131k s\u00fcrecinizi otomatikle\u015ftirmenin zaman\u0131 gelmi\u015ftir.<\/p>\n<p>Otomasyonun acil oldu\u011funu g\u00f6steren pratik g\u00f6stergeler:<\/p>\n<ul>\n<li>\u0130\u015f planlama b\u00f6l\u00fcm\u00fcne ek personel al\u0131nmadan yeni sipari\u015fler kabul edilemez<\/li>\n<li>\u00c7al\u0131\u015fanlar, zamanlar\u0131n\u0131n yar\u0131s\u0131ndan fazlas\u0131n\u0131 teknik i\u015fler yerine idari g\u00f6revlere ay\u0131r\u0131yor<\/li>\n<li>M\u00fc\u015fteriler uzun teslimat s\u00fcrelerinden \u015fikayet ederken, bunun nedeni \u00fcretim sahas\u0131 de\u011fildir<\/li>\n<li>Par\u00e7a listelerindeki veya \u00e7izimlerdeki hatalar, en az haftada bir kez \u00fcretim sahas\u0131nda sorunlara yol a\u00e7maktad\u0131r<\/li>\n<\/ul>\n<p>Otomasyonun tek seferde ger\u00e7ekle\u015ftirilmesi gerekmez. Bir\u00e7ok \u015firket, kesim listelerinin olu\u015fturulmas\u0131 veya CAD&#8217;in sipari\u015f sistemine entegre edilmesi gibi en zaman al\u0131c\u0131 ad\u0131mlar\u0131 otomatikle\u015ftirerek ba\u015flar ve buradan yola \u00e7\u0131karak ilerler. \u00c7al\u0131\u015fanlar\u0131n\u0131z\u0131 yeni \u00e7al\u0131\u015fma y\u00f6ntemlerine nas\u0131l h\u0131zl\u0131 bir \u015fekilde al\u0131\u015ft\u0131rabilece\u011finizi \u00f6\u011frenmek i\u00e7in mevcut <a href=\"https:\/\/ironcad.eu\/trainingen\/\">e\u011fitimlere<\/a> de g\u00f6z at\u0131n.  <\/p>\n<h2>IronCAD, i\u015f haz\u0131rl\u0131\u011f\u0131 s\u00fcrecindeki bir darbo\u011faz\u0131n giderilmesine nas\u0131l yard\u0131mc\u0131 olur?<\/h2>\n<p>IronCAD, i\u015f haz\u0131rl\u0131\u011f\u0131 s\u00fcrecinde en s\u0131k kar\u015f\u0131la\u015f\u0131lan sorunlara do\u011frudan bir \u00e7\u00f6z\u00fcm sunar. Yaz\u0131l\u0131m, h\u0131z ve esneklik g\u00f6z \u00f6n\u00fcnde bulundurularak tasarlanm\u0131\u015ft\u0131r; b\u00f6ylece tasar\u0131mc\u0131lar, saatler yerine dakikalar i\u00e7inde \u00f6zel tasar\u0131m varyantlar\u0131n\u0131 haz\u0131rlayabilirler. \u0130\u015f haz\u0131rl\u0131\u011f\u0131n\u0131z i\u00e7in somut avantajlar \u015funlard\u0131r:  <\/p>\n<ul>\n<li>Karma\u015f\u0131k ge\u00e7mi\u015f yap\u0131lar\u0131 i\u00e7ermeyen <strong>sezgisel 3D tasar\u0131m<\/strong>, b\u00f6ylece de\u011fi\u015fiklikler saniyeler i\u00e7inde uygulanabilir<\/li>\n<li>Tasar\u0131mdan kesim listeleri, malzeme listeleri, raporlar ve NC kodlar\u0131n\u0131n <strong>otomatik olarak olu\u015fturulmas\u0131<\/strong> <\/li>\n<li>ERP ile <strong>sorunsuz entegrasyon<\/strong> sayesinde sipari\u015f verileri i\u015f planlamas\u0131nda an\u0131nda kullan\u0131labilir hale gelir<\/li>\n<li>\u00d6zel \u00fcretim s\u00fcrecini h\u0131zland\u0131ran ve manuel i\u015flerden kaynaklanan hatalar\u0131 ortadan kald\u0131ran <strong>yeniden kullan\u0131labilir bile\u015fenler<\/strong> <\/li>\n<li><strong>H\u0131zl\u0131 \u00f6\u011frenilebilir<\/strong>: Yeni kullan\u0131c\u0131lar birka\u00e7 g\u00fcn i\u00e7inde i\u015flerine ba\u015flayabilir<\/li>\n<\/ul>\n<p>IronCAD&#8217;in i\u015f haz\u0131rl\u0131k s\u00fcrecinizdeki darbo\u011faz\u0131 \u00e7\u00f6z\u00fcp \u00e7\u00f6zemeyece\u011fini \u00f6\u011frenmek ister misiniz? Hi\u00e7bir y\u00fck\u00fcml\u00fcl\u00fck alt\u0131na girmeden g\u00f6r\u00fc\u015fmek i\u00e7in <a href=\"https:\/\/ironcad.eu\/tr\/iletisim\/\">bizimle ileti\u015fime ge\u00e7in<\/a>. Sizinle birlikte \u00f6zel durumunuzu incelemekten memnuniyet duyar\u0131z. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u0130\u015f haz\u0131rl\u0131\u011f\u0131, \u00fcretimden daha m\u0131 uzun s\u00fcr\u00fcyor? Darbo\u011faz\u0131 nas\u0131l tespit edip \u00e7\u00f6zebilece\u011finizi \u00f6\u011frenin. <\/p>\n","protected":false},"author":11,"featured_media":43120,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[267],"tags":[],"dipi_cpt_category":[],"class_list":["post-43119","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ironcad"],"_links":{"self":[{"href":"https:\/\/ironcad.eu\/tr\/wp-json\/wp\/v2\/posts\/43119","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ironcad.eu\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ironcad.eu\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ironcad.eu\/tr\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/ironcad.eu\/tr\/wp-json\/wp\/v2\/comments?post=43119"}],"version-history":[{"count":1,"href":"https:\/\/ironcad.eu\/tr\/wp-json\/wp\/v2\/posts\/43119\/revisions"}],"predecessor-version":[{"id":43642,"href":"https:\/\/ironcad.eu\/tr\/wp-json\/wp\/v2\/posts\/43119\/revisions\/43642"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ironcad.eu\/tr\/wp-json\/wp\/v2\/media\/43120"}],"wp:attachment":[{"href":"https:\/\/ironcad.eu\/tr\/wp-json\/wp\/v2\/media?parent=43119"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ironcad.eu\/tr\/wp-json\/wp\/v2\/categories?post=43119"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ironcad.eu\/tr\/wp-json\/wp\/v2\/tags?post=43119"},{"taxonomy":"dipi_cpt_category","embeddable":true,"href":"https:\/\/ironcad.eu\/tr\/wp-json\/wp\/v2\/dipi_cpt_category?post=43119"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}